|
Structural design for Tom McDonald Cellar, tank foundations and walkways, services building, new barrel hall and racking (clear span 30m x 20m x 7.5m stud with Thermomass column-free walls), amenities building, pipe bridges etc. Over 2000sq m in total buildings.
Very high stud tank room, massive tank foundations, canopies, walkways, pipe bridges, receival facilities, press foundations, effluent disposal, processing hall, boiler room, etc.
Staff amenities building including toilets, showers, changing, cafeteria. Two storey office, laboratory and meeting rooms. Single storey administration office building. Over 2500 q m buildings.
Tank and press foundations, barrel rooms, receival facility, services and pipe bridges.
Structural design of canopies, tank rooms, in-ground barrel hall. Total 1500sq m.
Approx 2500sq m new winery including processing hall, barrel hall, tank room, offices, laboratory, receival facility, tank bases etc.
Structural design of approx 2800sq m processing hall, tank room, barrel hall, offices, laboratory, receival facility, walkways etc.
Approx 2500sq m processing hall, tank room, in ground barrel hall, visitors centre, site works, access road, landscaping ponds, etc.
Approx 4500sq m structural design of processing hall, tank room, barrel room, offices, laboratory, receival facility, tank bases, cellar door, meeting rooms, etc.
Approx 1300sq m structural design of two storey building with barrel room, offices, tasting rooms, in -ground library and barrel room.
Temperature controlled bottled wine store, wine processing building. Further stages to be designed and implemented.
Approx 600sq m structural design of processing hall, tank room, barrel room, laboratory, receival facility and tank
500sq m barrel room.bases.
Two storey barrel room recessed into a bank, tank hall, administration block located above the barrel store, crusher pits.
New office building, workshops and spray shed.
Vineyard sheds, staff facilities and offices.
Barrel racking and walkways.
Receival ramps and drainage slabs, tank slabs and foundations, barrel racking.
380sq m barrel room, office and laboratory.
380sq m processing hall, tank rooms and tank walkways.
Vineyard shed, ramps, amenities buildings.
Receival bin proposal, barrel room alteration proposal.
Receival and press facilities tank foundations, press foundations, restaurant alterations.
Future barrel room and processing hall.
Resource Consent for winery. Workshop.
Processing room and barrel room.
Precast concrete design for restaurant.
Insulated concrete panel. Barrel store.
Underground barrel store.
Winery extensions and refurbishment.
Tank room, barrel room and canopy.
|
|