Other Relevant Aquatic Experience

QUEENSTOWN AQUATIC CENTRE (ALPINE AQUALAND)

Queenstown Lakes District Council
Principal Consultants, $18M project cost. 2008 completion.

Indoor 25m x 20m deep-end lap pool with ramp, large leisure pool, lazy river, toddlers’ pool with many features, large spa pool, two hydroslides, and dedicated learners’ pool. Weights gym and health and fitness area. Large foyer and administration to serve existing Events Centre and attached Aquatic Centre. Iconic building themed internally and externally. Myrtha Pool Technology.

GREY DISTRICT AQUATIC CENTRE

Grey District Council
Principal Consultants, $9.5M project cost. Completed 2009.

Indoor 25m 8lane deep end lap pool, therapeutic / learners’ / toddlers’ combined pool, spa pool, two hydroslides, large foyer to serve future gymnasium. Wet deck with water features; Pounamu feature, landscaped courtyard. Myrtha Pool Technology.

KAPITI COAST AQUATIC AND RECREATION CENTRE

Kapiti Coast District Council
Principal Consultants, Developed Design completed 2009. Estimated cost of Aquatic Centre $23M.

Indoor 50m x 25m x 2.4m pool, 25m pool, learner’s pool, spa pool and two hydroslides. Central admin block, cafe etc. Recreation centre with 3 court stadium, weights and aerobics gym.

ASHBURTON STADIUM

Ashburton District Council
Principal Consultants, project at concept stage

Indoor 35m x 25m x 2m and 3m deep lap pool with moveable floor and bulkhead, leisure / toddlers’ pool, spa pool, separate learners’ pool, two hydroslides. Central reception and admin block, cafe etc. Recreation centre with six court stadium, weights and aerobics gym corporate facilities.

ST PETERS COLLEGE POOL, CAMBRIDGE

Livingstone Builders
Design build contract. Project valve $2.5M, 2009 completion.

New 25m x 25m deep end pool plus all plant, change rooms etc. Myrtha Pool Technology.

CROMWELL SWIM CENTRE

Central Otago District Council
Principal Consultants, $3.7M project cost. 2008 completion.

Refurbishment of existing facility plus addition of a large learners’/therapeutic pool and toddlers’ pool plus extra multi-use room and family change rooms and a weights gymnasium capable of separate operation. Myrtha Pool Technology.

HUNTLY POOL, WAIKATO

Waikato District Council
Principal Consultants, total of $2M, pool upgrade completed 2005, enclosure building, 2008 completion.

Upgrade of existing pools and division into 25m lap pool plus warm-up and learners’/toddlers’ pool. Addition of gas heating system.
New insulated enclosure building plus provision of heat recovery.

PLEASANT POINT POOL

Timaru District Council
Principal Consultants, $0.7M project cost, 2009 completion.

Upgrading outdoor to give six lane 25m pool plus 15m x 4.5m learners’ pool. Upgraded plant plus new heating system. Myrtha Pool Technology.

WAITAKI AQUATIC CENTRE, OAMARU

Waitaki District Council
Principal Mechanical Consultant, $1.5M project cost, 2009 completion.

Refurbishment and upgrade of heating and ventilation system, upgrade of pool filtration system, installation of an acoustic ceiling, new lighting and remedial building works to the foyer. 

TRENT BRAY SWIM SCHOOL

Trent Bray Swim School
Principal Consultants, $1.7M project. 2008 completion.

New indoor facility with 25m and 13m purpose designed learn-to-swim pools in a fully insulated heated building. Myrtha Pool Technology.

FOXTON INDOOR POOL

Horowhenua District Council
Principal Consultants, $1.5M project cost, 2008 completion.

Addition to the existing outdoor pools of a 4/lane 25m lap pool plus a small learners’/toddlers’ pool in a new translucent covered building. New changing rooms etc. Myrtha Pool Technology.

GLENSHEA PARKS POOLS, PUTARURU

South Waikato District Council
Principal Consultants, $1.8M project cost, 2008 completion.

Upgrade existing outdoor pools. Shorten 33m pool to 28m and build new learners’ / toddlers’ pool. Upgrade surrounds and facilities. New plant. Myrtha Pool Technology.

LIDO AQUATIC LEISURE CENTRE

Palmerston North City Council
Principal Consultants, $6M project cost, 2002 completion.

Indoor 28m x 17m leisure pool with waterfalls, lazy river and features, toddlers’ pool with features, 12m x 7m learners’ pool, 9m x 4m spa pool, two hydroslides, café, sauna, steam room and weights gymnasium.  Outdoor  large free-form leisure pool with toddlers’ pool.  (Extensions to existing outdoor 50m and dive pools and indoor 25m lap pool). Myrtha Pool Technology.

AC BATHS

Taupo District Council
Principal Consultants, $7.5M project cost, 2003 completion.

Indoor eight lane 25m x 2m deep lap pool with 400 fixed seats, very large indoor/outdoor leisure pool with many features, 15m x 6m learners' pool, nine indoor private mineral pools, two hydroslides, sauna, steam, cafe, etc. Geothermal heating. (Connected to Taupo Events Centre). Myrtha Pool Technology.

MARINE PARADE HEATED SALTWATER POOLS (OCEAN SPA)

Napier City Council
Principal Consultants, $4M project cost, 2003 completion.

Two circular spa pools, 22m free-form soak pool, large free-form active and toddlers' pool, four lane 25m lap pool all outdoor, extensive landscaping and features. Main building with three private spas, extensive weights gym, change rooms etc. Cafeteria. Project earned an NZIA award for ASC Architects in 2005. Myrtha Pool Technology.

MOLYNEUX PARK AQUATIC CENTRE

Central Otago District Council
Principal Consultants, $3.8M project cost 2002 completion.

Indoor six lane 25m deep-end pool with ramp, combined learners' therapeutic toddlers' pool with many features, spa pool. provision for two future hydroslides. Outdoor 25m x 25m combination pools. Myrtha Pool Technology.

SPLASH PLANET

Hastings Tourism Facilities Trust
Secondary Consultants, $6.2M project cost, 1998 completion and $0.5M project cost, 2002 completion.

Themed water park, 1000sq m outdoor leisure pools including toddlers' play and splash pools with numerous features, five hydroslides, 320m long lazy river, indoor hot pools and hydroslide, landscaping, dry activities, cafe etc. LHTDesign responsible for civil, structural, pools, hydraulic, water quality design

WHAKATANE AQUATIC CENTRE

Whakatane District Council
Secondary Consultant, $3.6M project cost, 2001 completion.

Indoor seven lane 25m pool with deep-end and ramp, learner's / toddlers' pool with features, two spa pools, hydroslide.  LHTDesign civil, structural and water quality design.

TOKOROA POOL

South Waikato District Council
Principal Consultants, $2.5M project cost, 1996 completion.

Indoor six lane 25m pool with deep-end and ramp, 230sq m learners' / toddlers' / leisure pool with waterfall and features, two large spa pools, landscaped barbecue area. Project won Architectural awards. 

SWIMTASTIC SWIM SCHOOL, AUCKLAND

Auckland - privately owned
Principal Consultants, 2004 completion.

Indoor five lane 25m pool and special learners' pool installed in an existing industrial building. Myrtha Pool Technology.

NAENAE LEARNERS' POOL

Hutt City Council
Principal Consultants, $0.9M project cost, 1998 completion.

Large indoor combined learners' / toddlers' pool with play features.

WESTPAC TRUST AQUATIC CENTRE, WAIPUKURAU

CHB District Community Trust
Principal Consultants, $1.5M project cost, 1997 completion.

Indoor six lane 25m deep-end pool with ramp, learners'/toddlers' pool, outdoor barbecue area. Sports hall and gymnasium added 2003 with common administration.

FREYBERG COMMUNITY POOL, PALMERSTON NORTH

Palmerston North City Council
Principal Consultants, $1.9M project cost, 1998 completion.

Indoor six lane 25m deep-end with ramp, learners' / toddlers' pool. Attached to Freyberg High School gymnasium.

OXFORD POOL

Waimakiriri District Council
Principal Consultants to Arrow International, $1.3M construction cost, 2005 completion.

New outdoor four lane 25m pool with ramp and 9m x 6m learners' pool, change rooms, offices, heating and filtration plant, pool surrounds, fence etc. Myrtha Pool Technology.

SACRED HEART AQUATIC CENTRE, AUCKLAND

Sacred Heart College
Principal Consultants, $2.3M project cost, 2000 completion.

Indoor 25m x 20m x 2m polo and lap pool and 20m x 10m learners' pool. Outdoor 33m x 12m pool refurbished. Myrtha Pool Technology.

GERALDINE POOL

Timaru District Council
Principal Consultant, $0.5M project cost, 2002 completion.

Upgrading of outdoor pool to give six lane 25m lap pool plus 13m x 13m learners' / therapeutic and toddlers' pool.  New heat plant and extra filtration. Myrtha Pool Technology.

ARROWTOWN POOL

Queenstown Lakes District Council
Principal Consultant, $0.3M project cost, 2003 completion.

Upgrading of 30m outdoor pool. Myrtha Pool Technology.

EPSOM GIRLS POOLS, AUCKLAND

Epsom Girls Grammar School
Secondary Consultant, $1.8M project cost, 2001 completion.

Indoor 25m x 15m x 2m lap and polo pool.  Refurbishment of outdoor 22m x 11m pool.  LHTDesign civil, structural and water quality.

ONEKAWA POOL, NAPIER

Napier City Council
Principal Consultants, $2.2M project cost, 1998 and $0.45M project cost, 1999 completion.

Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool, two spa pools added to existing complex with indoor 25m pool and outdoor 50m and dive pools etc, two hydroslides added. Existing change and administration building converted to weights gym.

FRANKLIN AQUATIC CENTRE, PUKEKOHE

Franklin District Council
Principal Consultant (JV), $2.5M project cost, 1997 completion.

Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool.  Attached to large gymnasium and events stadium to provide new combined administration.

WAIROA COMMUNITY CENTRE

Wairoa District Council
Secondary Consultant, $3.2M project cost, 1998 completion.

Indoor six lane 25m deep-end pool with ramp, two court basketball stadium, multi-use rooms etc, common administration areas.  LHT Design civil, structural and water quality.

KAIAPOI POOL

Waimakiriri District Council
Principal Consultant, $1.4M project cost, 1995 completion.

Indoorsix lane 25m deep-end pool with ramp, learners' / toddlers' pool.

HYDROTHERAPY POOL, NAPIER

Napier Health Centre
1999 completion.

Specialist hospital hydrotherapy pool.

WAISPLASH, DANNEVIRKE

Tararua Aquatic Trust
Principal Consultant, $1.3M project cost, 1997 completion

Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool.

PALMERSTON NORTH BOYS' HIGH POOL

Palmerston North Boys' High School
Principal Consultant, $1.3M, 1995 completion.

Indoor six lane 25m deep-end pool with ramp.

MAKINO POOL

Manawatu District Council
Principal Consultant, $1.2M project cost, 1992 completion.

Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool.

TAUMARUNUI HIGH SCHOOL POOL

Taumarunui Pool Trust
Principal Consultant, $0.8M project cost, 1990 completion.

Indoor six lane 25m deep-end pool with ramp.

WATERWORLD, FLAXMERE, HASTINGS

Hastings District Council
Principal Consultant, $0.3M project cost, 1977 completion and $1.0M project cost, 1990 completion.

Indoor 25m x 15m lane pool, 15m x 6m learners' and toddlers' pool.  Pools built outdoor and enclosed  in 1990.  400sq m weights gymnasium in building.

ENTERPRISE AQUATIC CENTRE, GISBORNE

Enterprise Aquatic Trust
Principal Consultant, $0.25M project cost, 1986 completion and $0.3M project cost, 2003 completion.

Indoor six lane 25m pool.  Original translucent cover replaced with insulated enclosure and heating upgrade 2003.

MORNINGSIDE GYMNASIUM POOL, AUCKLAND

Morningside Gymnasium
Principal Consultant, 2000 completion.

Indoor four lane 25m deep-end pool in large commercial gymnasium.

CLIVE WAR MEMORIAL POOL

Clive Swimming Pool Trust
Principal Consultant, $0.4M project cost, 1994 completion.

Outdoor 30m, 8 lane pool converted to 25m lap pool and learners' pool and enclosed in an insulated building.

PAEROA POOL

Hauraki District Council
Principal Consultant, $0.2M project cost, 1996 completion

Outdoor replacement six lane 25m deep-end pool with ramp.

SCHOOL POOLS

Outdoor 25m pools for Shelley Bay, Auckland, Illminster Intermediate and Te Hapara, Gisborne.

SANSON POOL

Sanson School

20m x 7.5m indoor, translucent cover.

SWIMWELL, TAUPO

20m x 10m indoor, translucent cover.

 

 

 

 

Copyright © 2010 LHT Design | Site Map | Web design New Zealand by Acclipse