Queenstown Lakes District Council Principal Consultants, $18M project cost. 2008 completion.
Indoor 25m x 20m deep-end lap pool with ramp, large leisure pool, lazy river, toddlers’ pool with many features, large spa pool, two hydroslides, and dedicated learners’ pool. Weights gym and health and fitness area. Large foyer and administration to serve existing Events Centre and attached Aquatic Centre. Iconic building themed internally and externally. Myrtha Pool Technology.
Grey District Council Principal Consultants, $9.5M project cost. Completed 2009.
Indoor 25m 8lane deep end lap pool, therapeutic / learners’ / toddlers’ combined pool, spa pool, two hydroslides, large foyer to serve future gymnasium. Wet deck with water features; Pounamu feature, landscaped courtyard. Myrtha Pool Technology.
Kapiti Coast District Council Principal Consultants, Developed Design completed 2009. Estimated cost of Aquatic Centre $23M.
Indoor 50m x 25m x 2.4m pool, 25m pool, learner’s pool, spa pool and two hydroslides. Central admin block, cafe etc. Recreation centre with 3 court stadium, weights and aerobics gym.
Ashburton District Council Principal Consultants, project at concept stage
Indoor 35m x 25m x 2m and 3m deep lap pool with moveable floor and bulkhead, leisure / toddlers’ pool, spa pool, separate learners’ pool, two hydroslides. Central reception and admin block, cafe etc. Recreation centre with six court stadium, weights and aerobics gym corporate facilities.
Livingstone Builders Design build contract. Project valve $2.5M, 2009 completion.
New 25m x 25m deep end pool plus all plant, change rooms etc. Myrtha Pool Technology.
Central Otago District Council Principal Consultants, $3.7M project cost. 2008 completion.
Refurbishment of existing facility plus addition of a large learners’/therapeutic pool and toddlers’ pool plus extra multi-use room and family change rooms and a weights gymnasium capable of separate operation. Myrtha Pool Technology.
Waikato District Council Principal Consultants, total of $2M, pool upgrade completed 2005, enclosure building, 2008 completion.
Upgrade of existing pools and division into 25m lap pool plus warm-up and learners’/toddlers’ pool. Addition of gas heating system. New insulated enclosure building plus provision of heat recovery.
Timaru District Council Principal Consultants, $0.7M project cost, 2009 completion.
Upgrading outdoor to give six lane 25m pool plus 15m x 4.5m learners’ pool. Upgraded plant plus new heating system. Myrtha Pool Technology.
Waitaki District Council Principal Mechanical Consultant, $1.5M project cost, 2009 completion.
Refurbishment and upgrade of heating and ventilation system, upgrade of pool filtration system, installation of an acoustic ceiling, new lighting and remedial building works to the foyer.
Trent Bray Swim School Principal Consultants, $1.7M project. 2008 completion.
New indoor facility with 25m and 13m purpose designed learn-to-swim pools in a fully insulated heated building. Myrtha Pool Technology.
Horowhenua District Council Principal Consultants, $1.5M project cost, 2008 completion.
Addition to the existing outdoor pools of a 4/lane 25m lap pool plus a small learners’/toddlers’ pool in a new translucent covered building. New changing rooms etc. Myrtha Pool Technology.
South Waikato District Council Principal Consultants, $1.8M project cost, 2008 completion.
Upgrade existing outdoor pools. Shorten 33m pool to 28m and build new learners’ / toddlers’ pool. Upgrade surrounds and facilities. New plant. Myrtha Pool Technology.
Palmerston North City Council Principal Consultants, $6M project cost, 2002 completion.
Indoor 28m x 17m leisure pool with waterfalls, lazy river and features, toddlers’ pool with features, 12m x 7m learners’ pool, 9m x 4m spa pool, two hydroslides, café, sauna, steam room and weights gymnasium. Outdoor large free-form leisure pool with toddlers’ pool. (Extensions to existing outdoor 50m and dive pools and indoor 25m lap pool). Myrtha Pool Technology.
Taupo District Council Principal Consultants, $7.5M project cost, 2003 completion.
Indoor eight lane 25m x 2m deep lap pool with 400 fixed seats, very large indoor/outdoor leisure pool with many features, 15m x 6m learners' pool, nine indoor private mineral pools, two hydroslides, sauna, steam, cafe, etc. Geothermal heating. (Connected to Taupo Events Centre). Myrtha Pool Technology.
Napier City Council Principal Consultants, $4M project cost, 2003 completion.
Two circular spa pools, 22m free-form soak pool, large free-form active and toddlers' pool, four lane 25m lap pool all outdoor, extensive landscaping and features. Main building with three private spas, extensive weights gym, change rooms etc. Cafeteria. Project earned an NZIA award for ASC Architects in 2005. Myrtha Pool Technology.
Central Otago District Council Principal Consultants, $3.8M project cost 2002 completion.
Indoor six lane 25m deep-end pool with ramp, combined learners' therapeutic toddlers' pool with many features, spa pool. provision for two future hydroslides. Outdoor 25m x 25m combination pools. Myrtha Pool Technology.
Hastings Tourism Facilities Trust Secondary Consultants, $6.2M project cost, 1998 completion and $0.5M project cost, 2002 completion.
Themed water park, 1000sq m outdoor leisure pools including toddlers' play and splash pools with numerous features, five hydroslides, 320m long lazy river, indoor hot pools and hydroslide, landscaping, dry activities, cafe etc. LHTDesign responsible for civil, structural, pools, hydraulic, water quality design
Whakatane District Council Secondary Consultant, $3.6M project cost, 2001 completion.
Indoor seven lane 25m pool with deep-end and ramp, learner's / toddlers' pool with features, two spa pools, hydroslide. LHTDesign civil, structural and water quality design.
South Waikato District Council Principal Consultants, $2.5M project cost, 1996 completion.
Indoor six lane 25m pool with deep-end and ramp, 230sq m learners' / toddlers' / leisure pool with waterfall and features, two large spa pools, landscaped barbecue area. Project won Architectural awards.
Auckland - privately owned Principal Consultants, 2004 completion.
Indoor five lane 25m pool and special learners' pool installed in an existing industrial building. Myrtha Pool Technology.
Hutt City Council Principal Consultants, $0.9M project cost, 1998 completion.
Large indoor combined learners' / toddlers' pool with play features.
CHB District Community Trust Principal Consultants, $1.5M project cost, 1997 completion.
Indoor six lane 25m deep-end pool with ramp, learners'/toddlers' pool, outdoor barbecue area. Sports hall and gymnasium added 2003 with common administration.
Palmerston North City Council Principal Consultants, $1.9M project cost, 1998 completion.
Indoor six lane 25m deep-end with ramp, learners' / toddlers' pool. Attached to Freyberg High School gymnasium.
Waimakiriri District Council Principal Consultants to Arrow International, $1.3M construction cost, 2005 completion.
New outdoor four lane 25m pool with ramp and 9m x 6m learners' pool, change rooms, offices, heating and filtration plant, pool surrounds, fence etc. Myrtha Pool Technology.
Sacred Heart College Principal Consultants, $2.3M project cost, 2000 completion.
Indoor 25m x 20m x 2m polo and lap pool and 20m x 10m learners' pool. Outdoor 33m x 12m pool refurbished. Myrtha Pool Technology.
Timaru District Council Principal Consultant, $0.5M project cost, 2002 completion.
Upgrading of outdoor pool to give six lane 25m lap pool plus 13m x 13m learners' / therapeutic and toddlers' pool. New heat plant and extra filtration. Myrtha Pool Technology.
Queenstown Lakes District Council Principal Consultant, $0.3M project cost, 2003 completion.
Upgrading of 30m outdoor pool. Myrtha Pool Technology.
Epsom Girls Grammar School Secondary Consultant, $1.8M project cost, 2001 completion.
Indoor 25m x 15m x 2m lap and polo pool. Refurbishment of outdoor 22m x 11m pool. LHTDesign civil, structural and water quality.
Napier City Council Principal Consultants, $2.2M project cost, 1998 and $0.45M project cost, 1999 completion.
Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool, two spa pools added to existing complex with indoor 25m pool and outdoor 50m and dive pools etc, two hydroslides added. Existing change and administration building converted to weights gym.
Franklin District Council Principal Consultant (JV), $2.5M project cost, 1997 completion.
Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool. Attached to large gymnasium and events stadium to provide new combined administration.
Wairoa District Council Secondary Consultant, $3.2M project cost, 1998 completion.
Indoor six lane 25m deep-end pool with ramp, two court basketball stadium, multi-use rooms etc, common administration areas. LHT Design civil, structural and water quality.
Waimakiriri District Council Principal Consultant, $1.4M project cost, 1995 completion.
Indoorsix lane 25m deep-end pool with ramp, learners' / toddlers' pool.
Napier Health Centre 1999 completion.
Specialist hospital hydrotherapy pool.
Tararua Aquatic Trust Principal Consultant, $1.3M project cost, 1997 completion
Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool.
Palmerston North Boys' High School Principal Consultant, $1.3M, 1995 completion.
Indoor six lane 25m deep-end pool with ramp.
Manawatu District Council Principal Consultant, $1.2M project cost, 1992 completion.
Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool.
Taumarunui Pool Trust Principal Consultant, $0.8M project cost, 1990 completion.
Indoor six lane 25m deep-end pool with ramp.
Hastings District Council Principal Consultant, $0.3M project cost, 1977 completion and $1.0M project cost, 1990 completion.
Indoor 25m x 15m lane pool, 15m x 6m learners' and toddlers' pool. Pools built outdoor and enclosed in 1990. 400sq m weights gymnasium in building.
Enterprise Aquatic Trust Principal Consultant, $0.25M project cost, 1986 completion and $0.3M project cost, 2003 completion.
Indoor six lane 25m pool. Original translucent cover replaced with insulated enclosure and heating upgrade 2003.
Morningside Gymnasium Principal Consultant, 2000 completion.
Indoor four lane 25m deep-end pool in large commercial gymnasium.
Clive Swimming Pool Trust Principal Consultant, $0.4M project cost, 1994 completion.
Outdoor 30m, 8 lane pool converted to 25m lap pool and learners' pool and enclosed in an insulated building.
Hauraki District Council Principal Consultant, $0.2M project cost, 1996 completion
Outdoor replacement six lane 25m deep-end pool with ramp.
Outdoor 25m pools for Shelley Bay, Auckland, Illminster Intermediate and Te Hapara, Gisborne.
Sanson School
20m x 7.5m indoor, translucent cover.
20m x 10m indoor, translucent cover. |