Onekawa Pool Development, Napier

BRIEF
To design a new indoor 25mpool together with a large learners' / toddlers’ pool and spa pools to be housed within a new structure which would link into the existing 25m indoor pool and complement the outdoor 50m pool. 

To design two state-of-the-art water slides to lift the entertainment value of the facility.

PROJECT OUTLINE

  • A new six lane 25m deep end pool with a ramp.
  • A large learners/toddlers’ pool with a babies' pool.  All pools fully tiled.
  • Large spa pools.
  • A new enclosure to house the pools with viewing over the existing outdoor pool.
  • Staff amenities and changing rooms.
  • A laminated timber structure with acoustic ceilings.
  • DE and sand filters, and on-site generated hypochlorination.
  • A heat pump heat sink system, sail cloth ducts.
  • Gas heating to the existing pool.
  • Two seamless tube hydroslides with chute finishes and a vertical drop of 7.5m.

LHTDESIGN’S SCOPE OF WORKS
As principal consultants of this $2.8M two-phase swimming pool project, LHTDesign led the project team (including Graeme Weaver and John Loughnan Mechanical Engineer) and controlled and coordinated the development of the concept, documentation and administration of construction.

LHTDesign also had particular responsibility for civil and structural engineering, fire safety and water quality.

OUTCOME
The project was completed on time and within budget.

The completed facility fully met the design, functional, and financial requirements of the client.

REFERENCE
For a client’s perspective on this project please contact Neil Taylor, CEO of the Napier City Council .  Phone: (06) 835 7579



 

 