Feasibility Studies For Aquatic Centres

KAPIITI COAST AQUATIC CENTRE & STADIUM

2008 feasibility study for aquatic centre with 50m indoor pool plus other pools and hydroslides; recreation centre with 3 court stadium, fitness gymnasium etc.

ASHBURTON STADIUM

Provided data and concept plans etc to Global Leisure Group and Deloitte to prepare feasibility and business plan to aquatic centre and 6 court stadium. 2008 estimate $30M.

HUNTLY INDOOR POOL

Waikato District Council

Indoor  six lane 25m deep-end pool with ramp, learners' / toddlers' pool.  1998 study estimated cost at $2M plus.  Not proceeded with.  Existing outdoor pool upgraded to LHTDesign specifications in 2004.

MOTUEKA INDOOR POOL

Tasman District Council

Indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool, spa pool.  Study carried out in 1998.  Since updated and amended for different site.  Current estimate approximately $3M.

New study carried out in 2005 for aquatic centre attached to existing Events Centre with joint control. Budget $4 -$5M.

QUEENSTOWN AQUATIC CENTRE

Queenstown Lakes District Council

2004 peer review and input into updated study by Strategic Leisure for a large indoor Aquatic Centre operated in conjunction with the existing Events Centre.

CROMWELL SWIM CENTRE

Central Otago District Council

Existing 25m indoor pool and learners' pool to be extended and upgraded to include a combined learners' / hydrotherapy pool and toddlers' pool plus a weights gymnasium and dry change facilities. Estimated $2.85M in 2005.

WESTPORT SPORTS CENTRE

Buller District Council

2003 study for indoor six lane 25m deep-end pool with ramp, learners' / toddlers' pool and spa pool integrated with one court sports hall and weights gymnasium attached to grandstand to sports field and cycle track.  Estimate approximately $5M.

GREYMOUTH POOL

Grey District Council

2003 study for indoor  six lane 25m deep-end pool with ramp, learners' / toddlers' and spa pool.  Estimate approximately $3.5M.

PICTON POOL

Picton Pool Group

2006 study for indoor six lane 25m deep end pool with ramp, learners’ / toddlers’ / therapeutic pool and spa pool. Estimate $4M. Comparison of four alternative sites.

CLUTHA RECREATION CENTRE

2006 Initial report prepared in conjunction with Global Leisure Group for indoor swimming and indoor sports facilities. Completion of feasibility study awaiting finalization of District Council recreation strategy.

 

 

 

 