Prebbleton Primary School Hall, Canterbury

BRIEF
To create an aesthetically-pleasing, functional, practical, modern complex to meet the school’s immediate and future needs whilst also being an invaluable asset serving the local community.

SCHOOL BUILDING DESIGN PROJECT OUTLINE

  • 650sq m project footprint, of which 320sq m is a multi-purpose main hall auditorium.
  • Facilities include moveable stage, sprung floor, kitchen, library, amenities, green room, storage, music room, large entrance canopy and foyer.

LHTDESIGN’S SCOPE OF WORKS
LHTDesign worked closely with the main contractor Ahead Buildings, to provide structural, insulation, architectural and fire safety documentation for Building Consent purposes.

Throughout the school building project, LHTDesign utilised economic design and documentation methods, maximised the use of timber including Triboard wall panels, and provided practical and effective detailing as required by Ahead Buildings to suit its construction methods and to obtain the best value for money for the owner.

OUTCOME
The new complex has been positively received with good reviews from the Board of Trustees, staff and students alike. 

The project was finished within time and cost expectations as a result of the consistent effort put in by the project team (Ahead Buildings, LHTDesign and Mike Grace Builders).

REFERENCE
For a client’s perspective on this project please contact Bill Taylor of Ahead Buildings. Phone: (09) 570 9362.

 

Printable PDF page

 

Copyright © 2010 LHT Design | Site Map | Web design New Zealand by Acclipse