Swimtastic Swim School, St Johns, Auckland

BRIEF
To project manage the construction of a specialist swim training pool designed by LHTDesign within an existing industrial building.

PROJECT OUTLINE
The project comprised a five lane 25m graduated across the pool for constant depth lanes plus a learn-to-swim pool with varying depth and seating on all four sides.  For a more in-depth design outline click here.

LHTDESIGN’S SCOPE OF WORKS

  • Co-ordination with Auckland City Council regarding consent application.
  • Assisting the Mechanical Engineer, John Loughnan with layout and ventilation system design.
  • Obtaining tenders for sundry items not covered by the building contract e.g. floor coverings, fans, coils, louvres, drainage, gas, hardware, aluminium and timber joinery, etc.
  • Site visits.
  • Co-ordination of builders, plumbers, electricians and other subtrades.
  • Liaison with the client.
  • Day-to-day problem solving.
  • Checking and processing progress payments.
  • General project management duties.

OUTCOME
Swimtastic opened on the client’s planned date, and has proved to be an effective and well-received facility.

REFERENCE
For a client’s perspective on this project please contact Mark Bone, Director of Swimtastic. Phone: (09) 575 8018.

Copyright © 2010 LHT Design | Site Map | Web design New Zealand by Acclipse