BRIEF To design and produce drawings for Building Consent and construction of a new waxing enclosure.
BUILDING CONSULTANCY / PROJECT MANAGEMENT PROJECT OUTLINE The project comprised a 19m x 8m x 6m high steel frame building clad in Zincalume to house the apple packhouse waxing plant.
LHTDESIGN'S SCOPE OF WORKS
Consultation and briefing from client.
Site investigation and measurements.
Brief to LHTDesign's structural engineer.
Brief to LHTDesign's draughters.
Consultation with the client over preliminary drawings.
Preparing a Consent application on client's behalf.
Issuing of construction drawings for tender.
OUTCOME Mr Apple's new waxing enclosure was organised and built during the off-season with minimal disruption and involvement.
REFERENCE For a client's perspective on this project please contact Simon Dalton of Mr Apple NZ. Phone: (06) 873 1070.